Assemble the production traveler for a job
When an order is released, Maito builds the traveler from the approved revision and routing and checks it before it prints.
Operations · Manufacturing · When something happens · Updated
Works with
- Slack
- Box
- Dropbox
- Notion
- Microsoft 365
- Confluence
How do you assemble a production traveler?
To assemble a production traveler, run it when a job is released. Maito builds the traveler from the approved drawing revision, routing and inspection checks in your job system and files, checks that the work instruction is the same revision, posts it in Slack, and holds it for your confirmation if anything is mismatched.
How it's done today
Staff rekey routing and print instructions that don't match the order.
What Maito does
- Pull the approved revision and routing
- Build the traveler
- Check the work instruction revision
- Hold it for the supervisor to release
Example
Loop run: Job 5821 released in the job system
Traveler drafted for Job 5821: 250 bracket A7, Rev C, due Nov 13, customer Initech Robotics. Routing: saw, CNC op 20, deburr, inspect, anodize (outside, Hooli Finishing), pack. Checks: first 5 pieces bore diameter, then every 10th. Held. Catch: the routing links the Rev B work instruction (WI-A7-B), but the order and the drawing are Rev C. Printing now would send the floor the old program notes. From the job system, the approved drawing and the routing record.
@Maito The WI is outdated, I'll update it today. Release after.
I'll recheck when WI-A7 changes to Rev C and post here. The traveler stays held until then and you confirm.
Maito (7:30 AM):
Traveler drafted for Job 5821: 250 bracket A7, Rev C, due Nov 13, customer Initech Robotics.
Routing: saw, CNC op 20, deburr, inspect, anodize (outside, Hooli Finishing), pack.
Checks: first 5 pieces bore diameter, then every 10th.
Held. Catch: the routing links the Rev B work instruction (WI-A7-B), but the order and the drawing are Rev C. Printing now would send the floor the old program notes.
From the job system, the approved drawing and the routing record.
Raul (7:41 AM):
The WI is outdated, I'll update it today. Release after.
Maito (7:41 AM):
I'll recheck when WI-A7 changes to Rev C and post here. The traveler stays held until then and you confirm.
How to set it up
- Ask your agent
“When a job is released in the job system, build the traveler from the approved revision, routing and checks, and check the work instruction revision matches. Post in #shop-floor and hold it until I confirm.”
- Connect files
- Google Drive
- Box
- Dropbox
- Notion
- Microsoft 365
- Connect docs
- Notion
- Confluence
- Box
- Use ERP
- NetSuite
No MCP server needed. Ask your agent to save a skill with the steps, then add the login or API key in Settings → Vault.
Not connected yet? Your agent sends you a link to sign in.
What it won't do
It checks that documents agree on revision. It does not review the routing itself or the process for correctness.
Questions
Your ERP, for example NetSuite, through a skill with a login or API key in the Vault. Drawings and work instructions come from Google Drive, Box, Dropbox, Notion or Microsoft 365, or docs in Notion, Confluence or Box.
It holds the traveler and says why. It checks again when the work instruction changes.
Only after you confirm.